Charges/Tariffs:
Extension &
Expansion of Meter
Disconnection/Reconnection
Charges
Meter Testing
Charges
Tariffs
Payment
Methods
Connection
& Expansion of Meter
A.
Simple Connection with Small Load:
The connection is
identified as simple connection with small load if these conditions
are applied:
1- The distance from the property and the nearest 11kV network is
1.5km or less and,
2- The connected power required is 60kW or less.
The charges for the this type of connections are as follows:
|
Type
of Meter |
Connection Charges |
|
Single Phase |
R.O. 10 |
|
Three Phase |
R.O. 40 |
|
C.T. Meter up to 500kVA |
R.O. 200 |
B.
Simple Connection with Large Load:
The connection is identified as
simple connection with large load if these conditions are applied:
1- The distance from the property and the nearest 11kV network is
1.5km or less and,
2- The connected power required is more than 60kW and less than
2500kW.
The charges for the this type of connections are as follows:
|
Type of
Meter |
Connection Charges |
Permitted Charges
(R.O. 10 FOR EACH KW) |
|
C.T. Meter up to 500kVA |
R.O. 200 |
100%
Commercial* |
50%
non-Commercial* |
|
C.T. Meter
above 500kVA |
R.O.
500 |
100%
Commercial |
50%
non-Commercial |
- non-Commercial Property: Residential property of 4 flats or less
and public properties such as mosques.
- Commercial Property: All the properties that is not classified as
non-commercial.
C. Complex Connection:
The connection is identified as
complex connection if these conditions are applied:
1- The distance from the property and the nearest 11kV network is
more than 1.5km or/and,
2- The connected power required is more than 2500kW.
The customer will then pay all the charges of equipments,
modifications and installations to make the network available and
will pay the connection charges as per the rates specified in above
tables.
Back to top
Disconnection/Reconnection Charges:
The charges for
disconnection and reconnection are as follows:
|
Type of
Meter |
Disconnection
/ Reconnection Charges |
|
All Types |
R.O. 7.5 |
Back to top
Meter Testing
Charges:
|
Type of
Meter |
Meter
Testing Charges |
|
All Types |
R.O. 10 |
Back to top
Tariffs:
|
Sector |
Price
Chart |
|
Residential |
(kWh) |
Bz / kWh |
|
|
0 - 3000 |
10 |
|
|
3001 - 5000 |
15 |
|
|
5001 - 7000 |
20 |
|
|
7001 - 1000 |
25 |
|
|
10001 & above |
30 |
|
Commercial |
Rate |
Bz / kWh |
|
|
Flat Rate |
20 |
|
Industrial |
Period of Year |
Bz / kWh |
|
|
September to April inclusive |
12 |
|
|
May to August inclusive |
24 |
|
Agriculture & Fisheries |
(kWh) |
Bz / kWh |
|
|
0 - 7000 |
10 |
|
|
7001 & above |
20 |
|
Tourism |
(kWh) |
Bz / kWh |
|
|
0 - 3000 |
10 |
|
|
3001 - 5000 |
15 |
|
|
5001 & above |
20 |
Back to top
How to Pay:
All functions of
payments have been outsourced to Oman Investment & Finance Company (OIFC),
hence all payments should be done through them in any of their
offices located in the following areas:
|
Branch |
Location |
Contact
Number |
|
Head Office |
MBD South, Near Oman Oil Petrol Station |
24817878 |
|
CBD Area |
Near Capital Polyclinic |
24789888 |
|
Qurum |
Al-Wadi Commercial Center |
24565497 |
|
Al-Khuwair |
Zakher Shopping Mall |
24481898 |
|
Al-Ghoubrah |
Near Al-Waleed Pharmacy |
24496342 |
|
Al-Hail |
A'Seeb |
24420501 |
|
Mobellah |
|
24452786 |
|
Al-Amerat |
|
24879112 |
OIFC Official Office Hours are as follows:
-
Saturday to Wednesday
08.00 AM - 01.00 PM and 04.00 PM - 06.00 PM
- Thursday
08.00 AM - 12.30 PM
Back to top
Payment Methods:
-
Cash
You can pay your
electricity bills by cash in any of the OIFC collection centers and
or any Bank in Oman.
-
Credit Cards
OIFC collection
centers only accept MASTERCARD and VISA cards for electricity bill
payments.
-
Internet
You can pay your
electricity bills if you have an Online Banking account with local
banks (i.e. Bank Muscat, NBO and Bank Dhofar)
-
Cheques
Payments through
cheques are accepted only for corporate clients. Personal cheques
are generally not accepted
Back to top
|